2020 Road project status updates
2020 CHIPSEAL
District project maps
Magnesium chloride applications
Please do not park any vehicles along the roads during chip seal or asphalt applications.
District 1
CR 100 – Catherine Store

This project will extend for a distance of 4.6 miles beginning on the north side of Highway 82 and stop at County Road 113. Preparations for this project will include pulling ditches, jetting and/or replacing culverts and crack sealing. This road will receive a 3/8th inch chipseal overlay.
CR 114 – CMC Road

CR 115 – Red Canyon Rd.

CR 125 – Dry Park Rd.

This project will extend for a distance of .66 miles starting at the intersection of CR’s 117 and 125 to the end of pavement. Preparations for this project will include pulling ditches, jetting and/or replacement of culverts and crack sealing… This road will receive a ¾” and 3/8th inch chipseal overlay.
CR 154 – Old Hwy 82

This project will extend for a distance of 1 mile starting at the intersection of Hwy 82 and CR 154 and stopping at the cemetery/City Limits. Preparations for this project will include pulling ditches, jetting and/or replacement of culverts and crack sealing. This road will receive a 3/4th inch and 3/8th inch chipseal overlay.
District 2
CR 204 – Roan Creek Rd.

This project will extend for a distance of 9.6 miles starting at the beginning of the road and ending at the Cowboy Chapel. Preparations for this project will include pulling ditches, jetting
and/or replacement of culverts and crack sealing. This road will receive a 3/8th inch chipseal overlay.