District 1 project map     |      District 2 project map     |     District 3 project map

    Magnesium chloride applications

Please do not park any vehicles along the roads during chip seal or asphalt applications.


Westbank Ridge work
From the second week in May through July, construction crews will install water and sewer lines on Westbank Ridge. Automated signals will be employed intermittently. Expect short delays. For questions, please call 970-945-1223.



District 1
  CR 100 - Catherine Store  
County Road 55 CR 108

 

traffic cone
100% complete
Catherine Store Road - 3/8" chip from Hwy 82 to CR 102 for 2.3 miles.
Prep work will consist of pulling ditch and cleaning culverts.

     
  CR 117 - Four Mile Road  
County Road 55 CR 108

 

traffic cone
100% complete
Four Mile Road - 3/8" chip from beginning of road to mile marker 2.8.
Prep work will consist of pulling ditch and cleaning culverts.
     
  CR 109 - Hardwick Bridge Road  
County Road 55 CR 108

 

traffic cone
100% complete

This project will begin at mile marker 1.8 and extend to mile marker 3.0 for a total length of 1.2 miles. The road will be milled followed by 4" new asphalt and shouldered with 3/4" road base.

Preparation activities will include installation of new culverts, hauling of ¾" road base and leveling followed by 3" road base.

     
CR 154 South - Old Highway 82  
County Road 69 cr 204

 

traffic cone
100% complete

This project will begin at CR 109 and extend to Hwy 82 (CMC Intersection) for a total of 1 mile. A 2" leveling course will be placed followed by ¾" road base for shouldering. Preparation activities will include culvert cleaning and/or replacement as needed. There will also be ditch cleaning and shoulder work activities.
 
     
District 2
  CR 210 - Mile Pond Road  
County Road 247 CR 247

traffic cone
100% complete
This project will begin at mile marker 1.2 and extend to mile marker 3.3 for a total length of 2.1 miles. The road will be milled, followed by 4" of gravel and 2" of asphalt. Preparation activities will include ditch cleaning and culvert replacements.
     
  CR 233 - Silt Mesa Road  
County Road 247 CR 247

traffic cone
100% complete
Silt Mesa Road - 3/8" chip from beginning of road to CR 214 for a total of 4.1 miles. Prep work will consist of soft spot repairs.
     
CR 297 - Wittwer Lane  
cr 259 CR 259
traffic cone
100% complete
This project will begin at the Intersection of State Hwy 325 and extend to the end of the road for a total length of .5 miles. There will be a 2" asphalt overlay placed. Preparation activities will include culvert replacement and ditch cleaning.
     
District 3
  CR 300 - RV Park Hill  
traffic cone
100% complete
This project will begin at the top of the hill and extend to the ranch driveway at the bottom for a total length of .5 miles. This road will be milled followed by 2" of ¾" road base and 4" of asphalt. Preparation activities will include soft spot digging and filling, culvert replacement and ditch cleaning.
 
     
  CR 311 - Divide Creek Road  
cr 260
cr 357
traffic cone
100% complete
This project will begin at the surface change at 80117 Mesa and extend to 6 Lazy K for a total length of 1.2 miles. There will be a 2" asphalt overlay placed. Preparation activities will be ditch cleaning and culvert replacement.
     
  CR 320 - Rifle Rulison Road
 
cr 300O cr 300

traffic cone
100% complete
This project will begin at CR 309 and extend to gravel portion of road for a total length of .3 miles. There will be a 2" overlay placed. Preparation activities will be ditch cleaning.
     
  CR 324 - Maxfield Road (McCray Property)
 
cr 302 cr 302

traffic cone
100% complete
Maxfield Road - 3/8" chip from CR 331 to CR 327 for .9 miles Prep work will consist of ditch cleaning.
  CR 331 - Dry Hollow Road
 
cr 303 cr 303
traffic cone
100% complete
Dry Hollow - 3/8" chip from CR 311 to CR 324 for 7.5 miles. Prep work will consist of ditch cleaning, culvert cleaning and/or replacement.
 

 


 
 

 

 
 
 
Road & Bridge Administration
District 2-3 facility
0298 County Road 333A
Rifle, CO 81650
Email Road & Bridge


970-625-8601 | phone
970-625-8627 | fax
  Road & Bridge
District 1 facility
7300 Highway 82
Glenwood Springs, CO 81601
Email Road & Bridge


970 945-1223 | phone
970-945-1318 | fax
   
 
privacy policy