District 1
  CR 101 - White Hill Road  
County Road 55 CR 55, 57, 59

County Road 101

previous view

traffic cone
100% complete

6/27/2013 - Chip-sealing is complete.

6/18/13 - County Road 101 leveling course complete, waiting for chip overlay.

6/3/13 - County Road 101 - White Hill Road - Asphalt resurfacing starts.
Prep work will consist of preparing the road for a leveling course and chip-seal will consist of cleaning roadside ditches and culverts to improve drainage and trimming brush. A 1" pavement leveling course will be applied to reestablish the proper drainage off the road and will be sealed with a 3/8 inch chip-seal.

     
  CR 102 - Missouri Heights  
County Road 69 Westbank

County Road 102

previous view

traffic cone
100% complete

CR 102 is 100% completed. Roads are dirty due to shouldering.

Prep work for preparing the road for a 3" pavement overlay will consist of ditch cleaning, brush clearing and culvert cleaning, followed by a 3" asphalt mat. Shouldering will be 2' on both sides of new pavement.

 
     
  CR 112 - Crystal Springs Mountain Road  
County Road 106 CR 106

County Road 102

previous view

traffic cone
100% complete
6/27/13 - Chip-sealing is complete
6/18/13 - County Road 112 chip seal complete, waiting for fog seal.
6/3/13 - County Road 112 - Crystal Springs Mountain - begin chip-sealing

3/8" coat of chip-seal.
     
  CR 110 - Old Dump Road  
County Road 112 CR 112

County Road 110

previous view

traffic cone
100% complete
6/27/13 - Chip-sealing is complete.
6/18/13 - County Road 110 leveling course complete, chip sealing today.
6/3/13 - County Road 110 - Old Dump Road - Asphalt resurfacing starts
6/12/13 - Leveling course to begin June 10. Chipping to follow immediately after

Prep work will consist of preparing the road for a leveling course and chip-seal will consist of cleaning roadside ditches and culverts to improve drainage and trimming brush. A 1" pavement leveling course will be applied to reestablish the proper drainage off the road and will be sealed with a 3/8 inch chip-seal.
     
  County Road 114 - CMC Road  

CMC road

previous view

CR 114
traffic cone
100% complete

CR 114 is 100% completed. Roads are dirty due to shouldering. Let it rain!

Prep work for preparing the road for a 3" pavement overlay will consist of ditch cleaning, brush clearing and culvert cleaning, followed by a 3" asphalt mat. Shouldering will be 2' on both sides of new pavement.

     
  CR 129 - Upper and Lower No Name Road  
County Road 127 CR 127

No Name road

previous view

traffic cone
100% complete

7/18/2013 - No Name Road is finished.

6/27/13 - No Name is paved and waiting for shouldering
Prep work for preparing the road for a 2" pavement overlay will consist of ditch cleaning, brush clearing and culvert cleaning, followed by a 2" asphalt mat. Shouldering both sides of new pavement.

 
     
District 2
  CR 238 - Slaughter Gulch  
County Road 161 CR 161

County Road 238

previous view

traffic cone
100% complete

10/22/2013 - CR238 is 100% completed.
9/25/2013 - 9/26/2013 - Base preparation
9/30/2013 - Paving

Prep work for preparing the road for a 2" pavement overlay will consist of ditch cleaning, brush clearing and culvert cleaning, followed by a 4" of gravel with a 2" asphalt mat. Shouldering will be 2' on both sides of new pavement.

     
  CR 241 - East Elk Creek  
Country Road 161A CR-161A

County Road 241

previous view

traffic cone
100% complete
6/26/13 - County Road 241 East Elk Creek is complete.

Prep work will consist of preparing the road for a leveling course and chip-seal will consist of cleaning roadside ditches and culverts to improve drainage and trimming brush. A 2" pavement leveling course will be applied to reestablish the proper drainage off the road and will be sealed with a 3/8 inch chip-seal.
     
  CR 244 - Fravert Resevoir  
County Road 190 CR-190

County Road 102

previous view

traffic cone
100% complete

9/24/2013 - CR 244 is 100% complete.

Prep work for preparing the road for a 2 inch pavement overlay will consist of ditch cleaning, brush clearing and culvert cleaning, followed by 4 inch of gravel and a 2 inch asphalt mat. Shouldering will be 2 feet on both sides of new pavement.

     
  Stephens Loop (County Roads 233, 291, 296)  
County Road 69 Westbank

County Road 296

previous view

County Road 221

County Road 291

previous view

100% complete
traffic cone

9/24/2013 - CR 233, 291, and 296 are 100% complete.

Prep work for preparing the road for a 3 inch pavement overlay will consist of ditch cleaning, brush clearing and culvert cleaning, followed by a 3 inch asphalt mat. Shouldering will be 2 feet on both sides of new pavement.

     
District 3
  CR 317 - Beaver Creek  
County Road 227 227

County Road 317

previous view

100% complete
traffic cone

9/24/2013 - CR 317 is 100% complete.

Beginning July 24, 2013, County Road 317 - Beaver Creek Road will be down to one lane due to road work. Expect delays. The one lane closure will prevent trucks from turning right going up, or turning left coming down. This project is expected to last at minimum two weeks.

Prep work for preparing the road for a 4 inch pavement overlay will consist of ditch cleaning, brush clearing and culvert replacements and cleaning, followed by 4 inch of gravel and a 4 inch asphalt mat. Shouldering will be 2 feet on both sides of new pavement.

     
  CR 342 - Fairview Road  
County Road 231

cr-231

County Road 342

previous view

100% complete
traffic cone

10/10/2013 - CR342 Road paving is 100% complete.

Prep work for preparing the road for a 4 inch pavement overlay will consist of ditch cleaning, brush clearing and culvert replacements and cleaning, followed by 4 inch of gravel and a 4 inch asphalt matt. Shouldering will be 2 feet on both sides of new pavement.

     
  CR 346 - Lower Airport Road  
County Road 240 cr240

County Road 346

previous view

100% complete
traffic cone

10/10/2013 - CR346 Road paving is 100% complete.

Prep work for preparing the road for a 4 inch pavement overlay will consist of ditch cleaning, brush clearing and culvert cleaning, followed by asphalt mat. Shouldering will be 2 feet on both sides of new pavement.

     
traffic cone Battlement Mesa chip-seal battlement mesa map
100% complete
6/18/2013 - Battlement chip-seal is 100% complete.

Battlement Mesa chip-seal -
- North Battlement Parkway
- Parachute Way
- Clear Creek Circle
- Placer Drive
- Eldora Drive
- Cobre Place
    larger image
County Road 102
 
 
 
Road & Bridge Administration
District 2-3 facility
0298 County Road 333A
Rifle, CO 81650
Email Road & Bridge


970-625-8601 | phone
970-625-8627 | fax
  Road & Bridge
District 1 facility
7300 Highway 82
Glenwood Springs, CO 81601
Email Road & Bridge


970 945-1223 | phone
970-945-1318 | fax
   
 
privacy policy